Short answerBIFMA and EN 1335 describe different groups of tests, and the mandatory requirements of the EAEU are determined by the type of product and applicable regulations. For a corporate order, record the requirements for documents and standards, the full scope of delivery, a confirmed deadline, installation, documents and service after launch. Compare options only according to the same specification and separately check all the conditions on which the price and date of availability depend.

[Decision guide]

What this article will help you decide

Who it is for

procurement, finance, office manager and project manager

Decision to make

compare proposals of the same composition and protect the budget from missed work

Check before you choose

do not compare the totals until the packaging, logistics, installation, warranty and replacement conditions match

What needs to be determined before requesting a quote?

BIFMA and EN 1335 describe different groups of tests, and the mandatory requirements of the EAEU are determined by the type of product and applicable regulations.

The solution starts with inputs and measurable requirements for documents and standards.

  • plan and use cases
  • quantity, deadline and budget guideline
  • documents, logistics and service

How to make a decision and compare options?

Request a document for a specific model, laboratory, test area, validity period and marking.

Compare options based on the same composition: product, configuration, documents, logistics, installation and service. Record any exception or analogue on a separate line so that the final price does not hide the differences.

Practical criterionCheck that the selected option solves the problem according to documents and standards and remains serviceable after launch.

What should be included in the specification and contract?

Request a document for a specific model, laboratory, test area, validity period and marking.

  • exact articles, sizes, materials and quantities;
  • confirmed deadline and schedule dependencies;
  • composition of delivery, lifting, assembly and acceptance;
  • guarantee of a specific series and the procedure for eliminating comments.

What mistakes to avoid?

It is a mistake to transfer a certificate from one series to a product that looks similar.

Do not take an advertising promise as a condition of a contract. If the outcome is dependent on availability, site readiness, sample approval, or a third-party contractor, this dependency should be visible in the schedule.

How does the PoMo Union Office address this challenge?

PoMo checks the task on the plan, selects series, samples and generates a specification according to documents and standards.

To calculate, send the floor plan, number of employees, city, desired launch date and project limitations. The team will match the problem with catalog, will prepare a plan and line-by-line specification without unconfirmed prices and deadlines.

Which series should I look at in the catalogue?

Below are starting points for comparison. Final compatibility, finishes, quantity and timing must be confirmed according to specification:

Sources and useful materials

Frequently asked questions

Does BIFMA replace the requirements of the EAEU?

No. Voluntary and mandatory requirements have different scope; applicability is checked for a specific product.

What data is needed for preliminary calculation?

Floor plan, number of employees, city, deadline, budget guideline and requirements for documents and standards.

Is it possible to compare several options?

Yes. PoMo can prepare comparable scenarios with the same scope of work and clearly stated differences.

Do these recommendations replace a commercial proposal?

No. The final conditions are fixed only after checking the configuration, availability, logistics and facility.

A low-commitment first step

Get a like-for-like specification and estimate

Send the floor plan, number of jobs, city, launch date and budget guideline. During working hours, the team will clarify the missing data and prepare a line-by-line specification with clear assumptions and individual options.

  1. 01

    You share the project details floor plan, number of workplaces, city, launch date and budget guideline.

  2. 02

    We review the brief We clarify the restrictions, availability and scope of work.

  3. 03

    You receive a clear next step line-by-line specification with clear assumptions and individual options.

Request a preliminary estimateAsk on WhatsApp
Sending a request does not commit you to an order. Price and lead time are confirmed only after we review the specification, availability, and site conditions.

Read also