[Decision guide]
What this article will help you decide
procurement, finance, office manager and project manager
compare proposals of the same composition and protect the budget from missed work
do not compare the totals until the packaging, logistics, installation, warranty and replacement conditions match
What needs to be determined before requesting a quote?
Gather warranty terms for each series before comparing suppliers.
The frame, mechanism, gas lift, fabric and electrics may have different conditions; the general phrase "manufacturer's warranty" is not sufficient.
- serial numbers and acceptance certificate
- service contact
- response and elimination time
How to make a decision and compare options?
Estimate job recovery time, not just the number of years in the promotional material.
Compare options based on the same composition: product, configuration, documents, logistics, installation and service. Record any exception or analogue on a separate line so that the final price does not hide the differences.
What should be included in the specification and contract?
It is a mistake to sign a general report without a register of comments and then prove when a defect occurred.
- exact articles, sizes, materials and quantities;
- confirmed deadline and schedule dependencies;
- composition of delivery, lifting, assembly and acceptance;
- guarantee of a specific series and the procedure for eliminating comments.
What mistakes to avoid?
PoMo transmits conditions by series, records comments upon acceptance and accompanies requests after installation.
Do not take an advertising promise as a condition of a contract. If the outcome is dependent on availability, site readiness, sample approval, or a third-party contractor, this dependency should be visible in the schedule.
How does the PoMo Union Office address this challenge?
What does the warranty cover?
To calculate, send the floor plan, number of employees, city, desired launch date and project limitations. The team will match the problem with catalog, will prepare a plan and line-by-line specification without unconfirmed prices and deadlines.
Which series should I look at in the catalogue?
Below are starting points for comparison. Final compatibility, finishes, quantity and timing must be confirmed according to specification:
Sources and useful materials
Frequently asked questions
The list depends on the manufacturer and series; it must be specified in writing by components and materials.
catalog
What data is needed for preliminary calculation?
Floor plan, number of employees, city, deadline, budget guideline and warranty and service requirements.
Is it possible to compare several options?
Yes. PoMo can prepare comparable scenarios with the same scope of work and clearly stated differences.
Do these recommendations replace a commercial proposal?
No. The final conditions are fixed only after checking the configuration, availability, logistics and facility.
A low-commitment first step
Get a like-for-like specification and estimate
Send the floor plan, number of jobs, city, launch date and budget guideline. During working hours, the team will clarify the missing data and prepare a line-by-line specification with clear assumptions and individual options.
- 01
You share the project details floor plan, number of workplaces, city, launch date and budget guideline.
- 02
We review the brief We clarify the restrictions, availability and scope of work.
- 03
You receive a clear next step line-by-line specification with clear assumptions and individual options.

