[Decision guide]
What this article will help you decide
project manager, facility team, IT and HR
link the number of seats, layout, electrical, storage and the possibility of team growth
do not approve dimensions separately from the plan: check aisles, chairs in working position, sockets and cable routes
What needs to be determined before requesting a quote?
Color codes need to be translated into actual furniture materials and physical samples, not judged on a screen.
The solution begins with initial data and measurable requirements for the brand book and finishes.
- plan and use cases
- quantity, deadline and budget guideline
- documents, logistics and service
How to make a decision and compare options?
Agree on the palette, permissible deviations, reference sample and rules for combining series.
Compare options based on the same composition: product, configuration, documents, logistics, installation and service. Record any exception or analogue on a separate line so that the final price does not hide the differences.
What should be included in the specification and contract?
Agree on the palette, permissible deviations, reference sample and rules for combining series.
- exact articles, sizes, materials and quantities;
- confirmed deadline and schedule dependencies;
- composition of delivery, lifting, assembly and acceptance;
- guarantee of a specific series and the procedure for eliminating comments.
What mistakes to avoid?
It’s a mistake to choose the same RAL without checking the texture, gloss and adjacent materials.
Do not take an advertising promise as a condition of a contract. If the outcome is dependent on availability, site readiness, sample approval, or a third-party contractor, this dependency should be visible in the schedule.
How does the PoMo Union Office address this challenge?
PoMo checks the task on the plan, selects series, samples and creates specifications for the brand book and finishes.
To calculate, send the floor plan, number of employees, city, desired launch date and project limitations. The team will match the problem with catalog, will prepare a plan and line-by-line specification without unconfirmed prices and deadlines.
Which series should I look at in the catalogue?
Below are starting points for comparison. Final compatibility, finishes, quantity and timing must be confirmed according to specification:
Sources and useful materials
Frequently asked questions
Is it possible to accurately repeat the corporate color?
Accuracy depends on material and technology; an acceptable match is confirmed with a physical sample.
What data is needed for preliminary calculation?
Floor plan, number of employees, city, deadline, budget guideline and requirements for brand book and finishes.
Is it possible to compare several options?
Yes. PoMo can prepare comparable scenarios with the same scope of work and clearly stated differences.
Do these recommendations replace a commercial proposal?
No. The final conditions are fixed only after checking the configuration, availability, logistics and facility.
A low-commitment first step
Calculate the workplace set
Send us the current plan, staffing program, workplace equipment, presence mode and launch date. During working hours, the team will clarify the missing data and prepare a layout option and a set of a standard workplace for calculation.
- 01
You share the project details current plan, staffing program, equipment at workplaces, presence mode and launch date.
- 02
We review the brief We clarify the restrictions, availability and scope of work.
- 03
You receive a clear next step arrangement option and a set of a typical workplace for calculations.

