[Office solutions by work style]

Agile office for project teams

Project teams need modular bench settings, short meeting points and visual work surfaces that can change between sprints.

Agile office for project teams — PoMo Union Office project

[Short answer]

What does the company get?

Project teams need modular bench settings, short meeting points and visual work surfaces that can change between sprints. The solution is tied to the plan, building services, actual workload and launch schedule, then recorded in a line-item specification.

PoMo Union Office has been operating since 2004 and manages the project from initial data to installed furniture. The scope, deadline and cost are confirmed only after checking a specific task.

Get a preliminary estimate

[Price of error]

Why you can't start with a random directory

Choosing only by a picture or the price of one item makes the project impossible to control. A fixed cellular layout cannot respond to team growth or changing project phases.

01

Check how the solution expands, reconfigures and accepts later additions.

This point is checked before ordering and recorded in the design or specification so that the result can be accepted according to understandable criteria.

02

Coordinate power, cable routes and service access before ordering.

This point is checked before ordering and recorded in the design or specification so that the result can be accepted according to understandable criteria.

03

Allow for growth without buying temporary furniture that cannot be reused.

This point is checked before ordering and recorded in the design or specification so that the result can be accepted according to understandable criteria.

[Expert review]

What distinguishes a working solution from a beautiful arrangement

For the “Agile office for project teams” task, we are not testing a set of items, but rather the connection between human behavior, planning, engineering and operations. The three criteria below must appear in the design before ordering.

01

Reconfiguration strategy

We show on the plan which elements can actually be rearranged, how many people and time will be required, and what will remain compatible.

Required evidence
Alternative layout and a list of reusable components
What fails if overlooked
Modularity remains a marketing claim when reconfiguration still requires new parts, electrical work or complete dismantling of the zone.
02

Electrical and cable route

We associate sockets, floor hatches, screens, charging and service access with a specific table configuration before releasing an order.

Required evidence
Combined plan of furniture and engineering points
What fails if overlooked
Extensions cross aisles and hatches become under supports or inaccessible after assembly.
03

Growth without throwaway solutions

We plan spare power points, compatible modules and a phased rule for adding workstations instead of buying empty desks in advance.

Required evidence
Team growth scenarios and list of compatible modules
What fails if overlooked
Expansion is stopped due to a removed series, lack of electrical power or the inability to rebuild an existing series.

[Result]

The result is a documented “Agile office for project teams” solution that can be accepted against the plan, specification and delivered scope.

The work is based on four control points: initial data, planning solution, final specification, delivery and acceptance. Changes after approval are recorded and do not remain in correspondence.

  1. 01

    Brief and plan

    We collect staff, premises, restrictions, budget guidelines and launch date.

  2. 02

    Planning and selection

    We verify workstation fit, clearances, storage and building services, then compare compatible product ranges.

  3. 03

    Specification

    We record SKUs, dimensions, finishes, quantities, logistics, installation and approved substitutions.

  4. 04

    Delivery and acceptance

    We label each shipment by zone, assemble the furniture and close every item in the acceptance report.

[Catalog]

Relevant furniture categories

All catalog series

Work tables and stations

Compare series, images and published characteristics. Finishes, availability and deadlines are confirmed in the request.

Open catalog

Office chairs

Compare series, images and published characteristics. Finishes, availability and deadlines are confirmed in the request.

Open catalog

Partitions and screens

Compare series, images and published characteristics. Finishes, availability and deadlines are confirmed in the request.

Open catalog

[Q&A]

Questions about “Agile office for project teams”

Direct answers without unconfirmed prices, terms and local promises.

Discuss the problem
What is included in “Agile office for project teams”?

The project includes analysis of initial data, verification of layout, selection of compatible series, line-by-line specification and agreed upon delivery and installation scenario. The exact composition depends on the object.

What should be checked before approving the solution?

Choosing only by a picture or the price of one item makes the project impossible to control. A fixed cellular layout cannot respond to team growth or changing project phases. First priority: Check how the solution expands, reconfigures and accepts later additions.

How should the completed result be accepted?

Result criterion: The result is a documented “Agile office for project teams” solution that can be accepted against the plan, specification and delivered scope. Check the plan, completeness, SKUs, finishes, assembly and recorded defects.

How is the cost calculated?

The cost is calculated after confirmation of layout, quantity, configurations, materials, address, logistics and installation. Unconfirmed prices are deliberately not published on the page.

Is it possible to implement the project in another city in Kazakhstan?

Yes. Design can be carried out remotely, and the route, packaging, installation and deadline are calculated for a specific city and site.

What information is needed to get started?

You need an up-to-date PDF or DWG, number of employees, list of premises, photographs of the facility, city, desired launch date and budget guideline.

[See also]

Related solutions

All pages of the section

Furniture for hybrid offices

A hybrid office distributes assigned and shared desks, lockers, calls and team days according to actual attendance.

More details

Activity-based office planning

Activity-based planning gives employees distinct settings for focus, calls, meetings, collaboration and recovery.

More details

Hot desking and shared workstations

Shared desks need fast chair adjustment, a clear surface, personal lockers and a rule for clearing the workstation.

More details

[Next step]

Get the project and line-by-line specification

Send us your plan and staffing program. We'll tell you what's missing for the calculation and suggest the next working step.

Add project details

Do you have a plan? Send the file to the manager via WhatsApp after the application - this way we will prepare the project faster.

Send a plan

WhatsApp