Turnkey office furnishing means managing all furniture items as a single project. The contractor collects requirements, checks the layout, generates specifications, organizes delivery, installation and warranty service. The customer receives ready-made work areas and one responsible partner instead of a chain of unrelated suppliers.

Short answerThe service usually includes a brief, project audit, furniture selection and testing, budgeting, contract and specification, reserve or production, logistics, installation, acceptance and service. The exact composition is fixed before the start of deliveries.

[Decision guide]

What this article will help you decide

Who it is for

project manager, office manager, purchasing and designer

Decision to make

turn an office task into a verifiable layout and comparable specification

Check before you choose

do not choose furniture only by the image or price: check the dimensions, function, availability, installation, warranty and the possibility of re-ordering

What does “turnkey” mean in office configurations?

The phrase makes sense only when the end result is specified in the contract. For a corporate office, this is not a set of boxes in the customer’s warehouse, but furniture delivered to the site, assembled according to the approved plan and accepted according to the act.

The equipment may include workstations, chairs, executive offices, meeting rooms, reception areas, waiting areas, kitchens, lockers and storage systems. If necessary, the contractor coordinates furniture with lighting, electrical, floor hatches and media equipment.

Seven stages of packaging

1. Brief and initial data

The team records the number of users, work scenarios, floor plan, budget range and launch date. At this stage, it is important to determine which zones are critical for the first day of work, and which can be completed in queues.

2. Check the layout

Dimensions, passages, opening of doors and cabinets, location of sockets, columns and engineering elements are checked. Errors found before ordering can be corrected faster and cheaper.

3. Selection of solutions and samples

For each zone, not one beautiful position is selected, but a compatible system. Chairs and materials are tested in the showroom; The customer is shown the main and alternative options according to budget and deadline.

4. Specification and budget

The table records names, articles, sizes, colors, quantity, price and delivery time. Delivery, installation and additional work are reflected separately. This creates a common version of the design for the purchaser, designer and contractor.

5. Contract, reserve and production

Warehouse items are reserved, ordered items are put into production. Any replacement must be agreed on function, appearance, price and timing, and not appear “after the fact” on site.

6. Logistics and installation

Delivery is synchronized with the readiness of the premises. For a large office, a step-by-step scheme is convenient: floor, zone or queue. Installers receive a layout plan, markings and access rules to the site.

7. Reception and service

After assembly, completeness, stability, operation of mechanisms, absence of damage and compliance with the plan are checked. Comments are entered into a single list with responsibilities and deadlines for elimination. The customer then receives documents and a channel for service calls.

Strong packaging makes deadlines and decisions visible: the customer understands what has already been approved, what is on the way and what is required from the site.

What documents does the customer need?

  • approved specification with articles and finishes;
  • furniture arrangement plan;
  • delivery and installation schedule;
  • agreement and annexes with the procedure for agreeing on replacements;
  • invoices, acts and warranty documents;
  • a list of comments and confirmation of their closure.

For organizations with formalized procurement, certificates, passports and additional closing documents may be required. It is better to agree on their composition before signing the contract.

How to reduce risks in terms of timing and budget

  1. Appoint one customer representative to confirm decisions.
  2. Close critical dimensions before order launch.
  3. Separate stock and order items on the schedule.
  4. Agree in advance on acceptable analogues and the replacement procedure.
  5. Link delivery to the certificate of readiness of the premises.
  6. Allow time to address concerns before the team moves.

PoMo Union Office works with corporate projects of 100 employees or more. One manager accompanies the project, and a warehouse program with an area of ​​4,000 m² allows you to reserve part of the solutions and arrange phased delivery.

Short answers

Is it possible to connect a completer if the design is already ready?

Yes. In this case, the first step is to check the specification, dimensions, item availability, and compatibility with the project schedule.

Is it possible to complete an office in parts?

Yes. The order is fixed in the plan and schedule: for example, first workplaces and meeting rooms, then additional zones.

How to compare two commercial offers?

Bring them to the same composition: items, materials, delivery, installation, warranty, term and documents. It is incorrect to compare the total amounts without the same configuration.

A low-commitment first step

Get preliminary specification

Send the floor plan, number of employees, city, launch date, budget guideline and zone requirements. During working hours, the team will clarify the missing data and prepare a preliminary specification and a clear next step for the project.

  1. 01

    You share the project details floor plan, number of employees, city, launch date, budget guideline and zone requirements.

  2. 02

    We review the brief We clarify the restrictions, availability and scope of work.

  3. 03

    You receive a clear next step preliminary specifications and a clear next step for the project.

Request a preliminary estimateAsk on WhatsApp
Sending a request does not commit you to an order. Price and lead time are confirmed only after we review the specification, availability, and site conditions.