[Decision guide]
What this article will help you decide
project manager, office manager, operation service and site contractors
put together a realistic schedule for delivery, installation and acceptance without stopping the launch of the office
do not confirm the date without checking the readiness of the premises, access, elevators, passes, party composition and time for comments
How to choose furniture before sending it to Ust-Kamenogorsk?
Choose series with clear technical documentation, available parts and confirmed quantities. For armchairs, agree on a sample, for tables - a configuration drawing, for cabinets - internal dimensions and locks.
Try to unify fasteners and basic models. This simplifies installation and allows you to keep a small set of service parts on site.
- exact article;
- color and material;
- number of packages;
- wiring diagram;
- list of spare parts.
What to check in packing and transportation?
Visible surfaces and corners require separate protection, glass elements require markings and correct orientation. Each batch requires a packing slip associated with the premises on the plan.
Check the number of transhipments and the carrier's responsibility. If the packaging is damaged, the condition is recorded before the cargo is moved further.
How to prepare assembly on site?
Before the crew arrives, check the elevator, doors, passes, floor readiness and clear unpacking areas. Tools and fasteners must match the entire batch, not the first model on the list.
Carry out acceptance after setting up the mechanisms and placing them. One act without a list of unchecked premises creates the risk of losing comments.
- unpacking areas;
- installation plan;
- marking;
- assembly control;
- act and period of correction.
How to get a project and delivery estimate?
PoMo completes projects in Kazakhstan. For Ust-Kamenogorsk, the team calculates furniture, packaging, route and installation after receiving the address and volume.
Submit your plan and list of zones. Categories can be pre-selected in PoMo catalog.
Sources and useful materials
- Office furniture catalog PoMo Union Office
- Design and equipment of PoMo offices
- Implemented projects PoMo Union Office
Frequently asked questions
Does PoMo deliver to Ust-Kamenogorsk?
Yes, transportation and installation conditions are calculated for the project.
How to protect furniture on a long route?
Use appropriate packaging, labeling, packing list and condition records upon delivery.
Are spare parts needed?
For a large batch, it is rational to agree on a small service reserve for fasteners and wear elements.
Is it possible to accept furniture in stages?
Yes, by premises or queues with separate acts.
Is there a fixed delivery price?
No, it depends on the volume, packaging, address and installation conditions.
A low-commitment first step
Estimate delivery and installation
Send the address, floor plan, party composition, business center rules, readiness of premises and work window. During working hours, the team will clarify the missing data and prepare a stage schedule, delivery route and acceptance checklist.
- 01
You share the project details address, floor plan, party composition, business center rules, readiness of premises and work window.
- 02
We review the brief We clarify the restrictions, availability and scope of work.
- 03
You receive a clear next step stage schedule, skidding route and acceptance checklist.