[Decision guide]
What this article will help you decide
project manager, office manager, operation service and site contractors
put together a realistic schedule for delivery, installation and acceptance without stopping the launch of the office
do not confirm the date without checking the readiness of the premises, access, elevators, passes, party composition and time for comments
What needs to be determined before requesting a quote?
Separate the entire specification into warehouse, production and import before signing the contract.
The same series may have different dates in colors, sizes and quantities; the model's promise is not equal to the party's reserve.
- confirmed balance
- sample approval date
- object readiness and installation window
How to make a decision and compare options?
Evaluate not the best possible time, but the confirmed date of readiness of the complete set of the zone.
Compare options based on the same composition: product, configuration, documents, logistics, installation and service. Record any exception or analogue on a separate line so that the final price does not hide the differences.
What should be included in the specification and contract?
The main risk is to open the office partially: the tables have arrived, but the chairs, fixtures or cables are delayed.
- exact articles, sizes, materials and quantities;
- confirmed deadline and schedule dependencies;
- composition of delivery, lifting, assembly and acceptance;
- guarantee of a specific series and the procedure for eliminating comments.
What mistakes to avoid?
PoMo checks items, generates a milestone schedule and offers warehouse equivalents only after checking the functions.
Do not take an advertising promise as a condition of a contract. If the outcome is dependent on availability, site readiness, sample approval, or a third-party contractor, this dependency should be visible in the schedule.
How does the PoMo Union Office address this challenge?
Can delivery be guaranteed within 7 days?
To calculate, send the floor plan, number of employees, city, desired launch date and project limitations. The team will match the problem with catalog, will prepare a plan and line-by-line specification without unconfirmed prices and deadlines.
Which series should I look at in the catalogue?
Below are starting points for comparison. Final compatibility, finishes, quantity and timing must be confirmed according to specification:
Sources and useful materials
Frequently asked questions
Only if the required batch is confirmed in the warehouse, the object is ready, and the volume and installation fit into the agreed schedule.
catalog
What data is needed for preliminary calculation?
Floor plan, number of employees, city, deadline, budget guideline and delivery schedule requirements.
Is it possible to compare several options?
Yes. PoMo can prepare comparable scenarios with the same scope of work and clearly stated differences.
Do these recommendations replace a commercial proposal?
No. The final conditions are fixed only after checking the configuration, availability, logistics and facility.
A low-commitment first step
Estimate delivery and installation
Send the address, floor plan, party composition, business center rules, readiness of premises and work window. During working hours, the team will clarify the missing data and prepare a stage schedule, delivery route and acceptance checklist.
- 01
You share the project details address, floor plan, party composition, business center rules, readiness of premises and work window.
- 02
We review the brief We clarify the restrictions, availability and scope of work.
- 03
You receive a clear next step stage schedule, skidding route and acceptance checklist.

