Short answerSelect the number of places in the module, the depth of the tabletops, the pitch of the supports, screens and power supply method. A module for six employees saves frame and cables, but is more difficult to rearrange; pairs are more convenient for gradual growth and small teams. For a corporate order, record the requirements for the bench system, the full scope of delivery, a confirmed deadline, installation, documents and service after launch.

[Decision guide]

What this article will help you decide

Who it is for

project manager, facility team, IT and HR

Decision to make

link the number of seats, layout, electrical, storage and the possibility of team growth

Check before you choose

do not approve dimensions separately from the plan: check aisles, chairs in working position, sockets and cable routes

What needs to be determined before requesting a quote?

Mark stations, chairs in working position and cable points on the plan.

The number of seats should not impair passages, access to hatches and the ability to replace one element.

  • size of monitors and equipment
  • position of floor hatches
  • personal or general storage

How to make a decision and compare options?

Compare the area per convenient seat and the completeness of electrification.

Compare options based on the same composition: product, configuration, documents, logistics, installation and service. Record any exception or analogue on a separate line so that the final price does not hide the differences.

Practical criterionFix the module diagram, dimensions of each element, screen, tray and socket blocks.

What should be included in the specification and contract?

It’s a mistake to order a beautiful configuration without matching the supports with the hatches and cabinets.

  • exact articles, sizes, materials and quantities;
  • confirmed deadline and schedule dependencies;
  • composition of delivery, lifting, assembly and acceptance;
  • guarantee of a specific series and the procedure for eliminating comments.

What mistakes to avoid?

PoMo collects a working node on the plan and selects stations from the catalog by quantity and time.

Do not take an advertising promise as a condition of a contract. If the outcome is dependent on availability, site readiness, sample approval, or a third-party contractor, this dependency should be visible in the schedule.

How does the PoMo Union Office address this challenge?

Which is better: a bench for 4 or two modules for 2 seats?

To calculate, send the floor plan, number of employees, city, desired launch date and project limitations. The team will match the problem with catalog, will prepare a plan and line-by-line specification without unconfirmed prices and deadlines.

Which series should I look at in the catalogue?

Below are starting points for comparison. Final compatibility, finishes, quantity and timing must be confirmed according to specification:

Sources and useful materials

Frequently asked questions

The module is 4 more compact, two modules are more flexible; the choice depends on the teams, engineering and future permutations.

desks

What data is needed for preliminary calculation?

Floor plan, number of employees, city, deadline, budget guideline and requirements for the bench system.

Is it possible to compare several options?

Yes. PoMo can prepare comparable scenarios with the same scope of work and clearly stated differences.

Do these recommendations replace a commercial proposal?

No. The final conditions are fixed only after checking the configuration, availability, logistics and facility.

A low-commitment first step

Calculate the workplace set

Send us the current plan, staffing program, workplace equipment, presence mode and launch date. During working hours, the team will clarify the missing data and prepare a layout option and a set of a standard workplace for calculation.

  1. 01

    You share the project details current plan, staffing program, equipment at workplaces, presence mode and launch date.

  2. 02

    We review the brief We clarify the restrictions, availability and scope of work.

  3. 03

    You receive a clear next step arrangement option and a set of a typical workplace for calculations.

Request a preliminary estimateAsk on WhatsApp
Sending a request does not commit you to an order. Price and lead time are confirmed only after we review the specification, availability, and site conditions.

Read also