[Decision guide]
What this article will help you decide
project manager, office manager, operation service and site contractors
put together a realistic schedule for delivery, installation and acceptance without stopping the launch of the office
do not confirm the date without checking the readiness of the premises, access, elevators, passes, party composition and time for comments
3–5 days before delivery
- confirm completion of dusty and wet work;
- protect finished floors and walls;
- issue passes and parking;
- check the width of the doors and the lifting capacity of the elevator;
- appoint a customer representative.
Graph and labeling
Break down large shipments by floor or zone. Each package must have a room code and items from the specification. Do not mix installation with work that creates dust or blocks passages.
Acceptance
First, the number of pieces and packages is checked, then the articles, colors and sizes. After assembly, check stability, gaps, adjustments, facades and absence of damage. Comments are recorded with a photograph, location, article number and deadline for elimination.
Delivery throughout Kazakhstan
For regions, the carrier, type of packaging, responsible party for transhipments and the presence of a local installation team are agreed upon in advance. PoMo will organize delivery and installation throughout Kazakhstan; Cost and schedule depend on the city, volume and conditions of the object.
Sources and useful materials
Frequently asked questions
Who is responsible for lifting furniture?
This must be expressly stated in the contract and estimate; Do not assume the lift is automatically turned on.
Is it possible to install it before the renovation is completed?
Disadvantages: Dust, moisture and parallel work increase the risk of damage and downtime.
How to fix defects?
Photo, article number, room, description, date and agreed upon period of elimination.
Does PoMo deliver to other cities in Kazakhstan?
Yes. The route, packaging, cost and installation are calculated for a specific city and object.
A low-commitment first step
Estimate delivery and installation
Send the address, floor plan, party composition, business center rules, readiness of premises and work window. During working hours, the team will clarify the missing data and prepare a stage schedule, delivery route and acceptance checklist.
- 01
You share the project details address, floor plan, party composition, business center rules, readiness of premises and work window.
- 02
We review the brief We clarify the restrictions, availability and scope of work.
- 03
You receive a clear next step stage schedule, skidding route and acceptance checklist.