Short answerWhen choosing Kano, first divide your office into workstations, cubicles, meeting rooms, storage, and common areas. For each series, check available sizes, materials, cable management and compatible items. Calculate the final price based on the full configuration, and the deadline - after confirmation of the specific quantity and finishing.

[Decision guide]

What this article will help you decide

Who it is for

HR, labor protection, purchasing and employees who test furniture

Decision to make

create a short list of models depending on the duration of operation, user growth and intensity of use

Check before you choose

Do not approve a lot based on a photo: check the adjustments, fit, load capacity, materials and warranty of the specific model

How to choose Kano workstations?

Match the desk module to the layout and team. Check single and group configurations, support positions, screens and trays. For multiple monitors, depth is important; for hybrid planting, the same preparation of places is important.

It is better to choose storage from a compatible system so that heights, decors and handles do not look like a random set.

  • sizes and number of seats;
  • frame and supports;
  • screens;
  • cable management;
  • cabinets and cabinets.

What to check in Kano executives' offices?

The executive table is valued together with the console, credenza and cabinets. Indicate the briefing side, equipment, cable outlets and type of meetings. The massive shape must fit into the elevator and fit through the doors.

The materials are agreed upon according to the sample. For veneer and textured decors, the direction of the pattern is fixed on visible surfaces.

Consider a full cabinetThe price of one table does not reflect the cost of storage, chairs, briefing, delivery and installation.

How to choose meeting rooms and chairs?

The table is selected based on the actual number of participants, sockets and video communication. The chairs must be suitable for the duration of the meetings and can be placed freely between the supports.

If the project includes several series, agree on a single color of metal and decor. This is more important than having the same brand at every position.

  • capacity;
  • electrician;
  • shape of supports;
  • chairs and aisles;
  • coordinated finishes.

How to order Kano furniture through PoMo?

Open Kano catalog, select the series you are interested in and send them along with the office plan. Product pages contain photographs and available technical data without fictitious prices.

PoMo will clarify the configurations, check compatibility and prepare a quote with logistics and installation.

Sources and useful materials

Frequently asked questions

Where can I see Kano products?

In a separate brand section of the PoMo catalog with categories and model pages.

Are there prices for Kano?

The price depends on the configuration and is confirmed in the commercial offer.

Is it possible to order one item?

Yes, subject to confirmation of availability and delivery conditions.

Can Kano be used with Sunon?

Yes, if the models are agreed upon in terms of functions, finishes and terms.

Do I need a plan to order?

The dimensions are sufficient for one position; for furnishing an office, the plan significantly reduces the risk of error.

A low-commitment first step

Shortlist chairs for testing and pricing

Send us the number of users, shift duration, height range, adjustment requirements and desired time frame. During working hours, the team will clarify the missing data and prepare a selection of suitable models and a test script before purchasing.

  1. 01

    You share the project details number of users, shift duration, height range, adjustment requirements and desired period.

  2. 02

    We review the brief We clarify the restrictions, availability and scope of work.

  3. 03

    You receive a clear next step selection of suitable models and testing scenario before purchasing.

Request a preliminary estimateAsk on WhatsApp
Sending a request does not commit you to an order. Price and lead time are confirmed only after we review the specification, availability, and site conditions.

Read also