Short answerA good technical specification for office furniture contains a floor plan, the number of users, a table of positions with functional requirements, acceptable sizes and materials, requirements for delivery, installation, warranty and acceptance. Don't describe the product only with a photo or brand: record measurable characteristics and conditions of equivalence.

[Decision guide]

What this article will help you decide

Who it is for

procurement, finance, office manager and project manager

Decision to make

compare proposals of the same composition and protect the budget from missed work

Check before you choose

do not compare the totals until the packaging, logistics, installation, warranty and replacement conditions match

1. Initial data

Indicate the address and floor of the facility, the deadline for the premises to be ready, the number of employees now and in a year, the access mode, the presence of a freight elevator and the person responsible for approval. Attach a PDF or DWG measurement plan with columns, doors, windows, sockets and floor hatches.

2. Specification table

For each item, create a line: zone, name, quantity, dimensional range, material, color, key functions, acceptable substitutions and note. It is more helpful for a chair to require height adjustment, lumbar support, and suitable load capacity than to specify a “premium ergonomic chair.”

Mini string patternOpen space · workstation for 2 places · 25 pcs. · length of space 1200–1400 mm · screen and cable channel · neutral decor · analogue is allowed after approval of the sample.

3. Quality and confirmation

Request technical data sheet, material information and warranty for the specific series. If BIFMA compliance is required, please specify which standard and document must be submitted. The supplier's general statement of standards does not replace confirmation of the selected model.

4. Logistics and installation

Record whether packaging, marking by zone, delivery, lifting, assembly, removal of packaging and correction of comments are included. Add time windows, admission rules, and a requirement to agree on a schedule before shipment.

5. Acceptance

Describe the criteria: correspondence of articles and colors, quantity, absence of damage, stability, operation of mechanisms, evenness of facades and completeness of fittings. Defects are recorded in a report with photographs, the elimination period is in the agreed schedule.

Common mistakes

  • there is no uniform plan and numbering of premises;
  • requirements consist of evaluative words;
  • installation and lifting are not specified;
  • proposals of different completeness are compared;
  • it is not determined who agrees on the analogues.

PoMo can check the original layout and prepare specification based on operational scenarios. The more accurate the initial data, the faster the proposal appears without unnecessary assumptions.

Sources and useful materials

Frequently asked questions

Can I specify a specific brand?

For commercial procurement it is possible, but for comparability it is useful to describe the functions and rules of equivalence. In regulated procurement, consider applicable legal requirements.

Do you need a DWG file?

Not always, but an accurate measurement plan significantly reduces the risk of planning and specification errors.

What should I write about the warranty?

Terms and conditions for each series, order of application and response time of the supplier.

Who should accept the furniture?

An appointed customer representative together with the project manager or installation team according to a pre-approved checklist.

A low-commitment first step

Get a like-for-like specification and estimate

Send the floor plan, number of jobs, city, launch date and budget guideline. During working hours, the team will clarify the missing data and prepare a line-by-line specification with clear assumptions and individual options.

  1. 01

    You share the project details floor plan, number of workplaces, city, launch date and budget guideline.

  2. 02

    We review the brief We clarify the restrictions, availability and scope of work.

  3. 03

    You receive a clear next step line-by-line specification with clear assumptions and individual options.

Request a preliminary estimateAsk on WhatsApp
Sending a request does not commit you to an order. Price and lead time are confirmed only after we review the specification, availability, and site conditions.