Short answerEach floor goes through a full cycle: release, dismantling, delivery, installation, inspection and return to the team. For a corporate order, record the requirements for floor-by-floor replacement, the full scope of delivery, a confirmed deadline, installation, documents and service after launch. Compare options only according to the same specification and separately check all the conditions on which the price and date of availability depend.

[Decision guide]

What this article will help you decide

Who it is for

administrative, facility and purchasing teams

Decision to make

calculate storage based on actual volume, access, security and future additions

Check before you choose

Don't just count the number of sections: check the internal format, opening of the facades, passages, locks and fastenings

What needs to be determined before requesting a quote?

Each floor goes through a full cycle: release, dismantling, delivery, installation, inspection and return to the team.

The solution starts with inputs and measurable floor-by-floor replacement requirements.

  • plan and use cases
  • quantity, deadline and budget guideline
  • documents, logistics and service

How to make a decision and compare options?

Agree on swing space, markings, temporary storage, elevators, removal and readiness criteria.

Compare options based on the same composition: product, configuration, documents, logistics, installation and service. Record any exception or analogue on a separate line so that the final price does not hide the differences.

Practical criterionCheck that the selected option solves the problem of floor-by-floor replacement and remains serviceable after launch.

What should be included in the specification and contract?

Agree on swing space, markings, temporary storage, elevators, removal and readiness criteria.

  • exact articles, sizes, materials and quantities;
  • confirmed deadline and schedule dependencies;
  • composition of delivery, lifting, assembly and acceptance;
  • guarantee of a specific series and the procedure for eliminating comments.

What mistakes to avoid?

It’s a mistake to start the next floor before closing the comments on the critical work areas of the previous one.

Do not take an advertising promise as a condition of a contract. If the outcome is dependent on availability, site readiness, sample approval, or a third-party contractor, this dependency should be visible in the schedule.

How does the PoMo Union Office address this challenge?

PoMo checks the task on the plan, selects series, samples and generates a specification for floor-by-floor replacement.

To calculate, send the floor plan, number of employees, city, desired launch date and project limitations. The team will match the problem with catalog, will prepare a plan and line-by-line specification without unconfirmed prices and deadlines.

Which series should I look at in the catalogue?

Below are starting points for comparison. Final compatibility, finishes, quantity and timing must be confirmed according to specification:

Sources and useful materials

Frequently asked questions

Do you need temporary workspace?

Yes, if employees cannot work remotely during a full cycle on their floor.

What data is needed for preliminary calculation?

Floor plan, number of employees, city, deadline, budget guideline and floor-by-floor replacement requirements.

Is it possible to compare several options?

Yes. PoMo can prepare comparable scenarios with the same scope of work and clearly stated differences.

Do these recommendations replace a commercial proposal?

No. The final conditions are fixed only after checking the configuration, availability, logistics and facility.

A low-commitment first step

Plan storage by zone

Send a list of items stored, number of users, access requirements, floor plan and height restrictions. During working hours, the team will clarify the missing data and prepare a storage diagram with module types and quantities by zone.

  1. 01

    You share the project details list of items stored, number of users, access requirements, layout and height restrictions.

  2. 02

    We review the brief We clarify the restrictions, availability and scope of work.

  3. 03

    You receive a clear next step storage diagram with module types and quantities by zone.

Request a preliminary estimateAsk on WhatsApp
Sending a request does not commit you to an order. Price and lead time are confirmed only after we review the specification, availability, and site conditions.