[Office scale]

Office equipment for 10 employees

Layout, furniture, budget structure and supply of an office for 10 employees.

Office equipment for 10 employees - PoMo Union Office project

[Short answer]

What does the company get?

An office with 10 employees cannot be considered a multiplication of one desk per staff. It is necessary to add meeting rooms, managers, storage, waiting, focus zones, growth reserve and installation. First, the program of premises is checked, then a small office without unnecessary furniture is formed.

PoMo Union Office has been operating since 2004 and manages the project from initial data to installed furniture. The scope, deadline and cost are confirmed only after checking a specific task.

Get a preliminary estimate

[Price of error]

Why you can't start with a random directory

The main error of scale is to count only jobs. This underestimates the area, budget and deadlines, and common areas have to be purchased at the last moment.

01

combine workstations, one flexible meeting room and shared storage

This point is checked before ordering and recorded in the design or specification so that the result can be accepted according to understandable criteria.

02

unify the main series and finishes

This point is checked before ordering and recorded in the design or specification so that the result can be accepted according to understandable criteria.

03

consider product, logistics and installation as separate blocks

This point is checked before ordering and recorded in the design or specification so that the result can be accepted according to understandable criteria.

[Expert review]

What distinguishes a working solution from a beautiful arrangement

For the task “Equipping an office for 10 employees,” we are checking not a set of items, but the connection between people’s behavior, layout, engineering and operation. The three criteria below must appear in the design before ordering.

01

Dimensions and working clearances

We check the furniture not according to its nominal size, but together with the removal of the chair, opening of the facades, working passages and the route of entry.

Required evidence
Plan with dimensions of furniture, passages and opening areas
What fails if overlooked
During installation, tables are placed formally but block traffic, cabinets or doors.
02

Reconfiguration strategy

We show on the plan which elements can actually be rearranged, how many people and time will be required, and what will remain compatible.

Required evidence
Alternative layout and a list of reusable components
What fails if overlooked
Modularity remains a marketing claim when reconfiguration still requires new parts, electrical work or complete dismantling of the zone.
03

Volume and frequency of access

We do not count the number of cabinets, but the type of items, folder format, number of users and frequency of access. We design operational and archival storage separately.

Required evidence
Storage sheet by department and content type
What fails if overlooked
Cabinets take up aisles, common closets overflow, and rarely used documents are stored in the most expensive area.

[Result]

managed project for 10 employees

The work is based on four control points: initial data, planning solution, final specification, delivery and acceptance. Changes after approval are recorded and do not remain in correspondence.

  1. 01

    Brief and plan

    We collect staff, premises, restrictions, budget guidelines and launch date.

  2. 02

    Planning and selection

    We verify workstation fit, clearances, storage and building services, then compare compatible product ranges.

  3. 03

    Specification

    We record SKUs, dimensions, finishes, quantities, logistics, installation and approved substitutions.

  4. 04

    Delivery and acceptance

    We label each shipment by zone, assemble the furniture and close every item in the acceptance report.

[Catalog]

Relevant furniture categories

All catalog series

Work tables and stations

Compare series, images and published characteristics. Finishes, availability and deadlines are confirmed in the request.

Open catalog

Office chairs

Compare series, images and published characteristics. Finishes, availability and deadlines are confirmed in the request.

Open catalog

Meeting tables

Compare series, images and published characteristics. Finishes, availability and deadlines are confirmed in the request.

Open catalog

Storage systems

Compare series, images and published characteristics. Finishes, availability and deadlines are confirmed in the request.

Open catalog

Upholstered furniture

Compare series, images and published characteristics. Finishes, availability and deadlines are confirmed in the request.

Open catalog

[Q&A]

Questions about the solution “Office configuration for 10 employees”

Direct answers without unconfirmed prices, terms and local promises.

Discuss the problem
What is included in the “Office configuration for 10 employees” solution?

The project includes analysis of initial data, verification of layout, selection of compatible series, line-by-line specification and agreed upon delivery and installation scenario. The exact composition depends on the object.

What should be checked before approving the solution?

The main error of scale is to count only jobs. This underestimates the area, budget and deadlines, and common areas have to be purchased at the last moment. First things first: combine workstations, one flexible meeting room and shared storage

How should the completed result be accepted?

Result criterion: managed project for 10 employees We check the layout, completeness, articles, finishes, assembly and comments on the document.

How is the cost calculated?

The cost is calculated after confirmation of layout, quantity, configurations, materials, address, logistics and installation. Unconfirmed prices are deliberately not published on the page.

Is it possible to implement the project in another city in Kazakhstan?

Yes. Design can be carried out remotely, and the route, packaging, installation and deadline are calculated for a specific city and site.

What information is needed to get started?

You need an up-to-date PDF or DWG, number of employees, list of premises, photographs of the facility, city, desired launch date and budget guideline.

[See also]

Related solutions

All pages of the section

Office equipment for 20 employees

Layout, furniture, budget structure and supply of an office for 20 employees.

More details

Office equipment for 50 employees

Layout, furniture, budget structure and supply of an office for 50 employees.

More details

Office equipment for 100 employees

Layout, furniture, budget structure and supply of an office for 100 employees.

More details

[Next step]

Get the project and line-by-line specification

Send us your plan and staffing program. We'll tell you what's missing for the calculation and suggest the next working step.

Add project details

Do you have a plan? Send the file to the manager via WhatsApp after the application - this way we will prepare the project faster.

Send a plan

WhatsApp