[Office scale]

Office equipment for 20 employees

Layout, furniture, budget structure and supply of an office for 20 employees.

Office equipment for 20 employees - PoMo Union Office project

[Short answer]

What does the company get?

An office with 20 employees cannot be considered a multiplication of one desk per staff. It is necessary to add meeting rooms, managers, storage, waiting, focus zones, growth reserve and installation. First, the program of premises is checked, then a compact office with room for growth is created.

PoMo Union Office has been operating since 2004 and manages the project from initial data to installed furniture. The scope, deadline and cost are confirmed only after checking a specific task.

Get a preliminary estimate

[Price of error]

Why you can't start with a random directory

The main error of scale is to count only jobs. This underestimates the area, budget and deadlines, and common areas have to be purchased at the last moment.

01

lay down several reserve places and do not overload the room with cabinets

This point is checked before ordering and recorded in the design or specification so that the result can be accepted according to understandable criteria.

02

unify the main series and finishes

This point is checked before ordering and recorded in the design or specification so that the result can be accepted according to understandable criteria.

03

consider product, logistics and installation as separate blocks

This point is checked before ordering and recorded in the design or specification so that the result can be accepted according to understandable criteria.

[Expert review]

What distinguishes a working solution from a beautiful arrangement

For the task “Equipping an office for 20 employees,” we are checking not a set of items, but the connection between people’s behavior, layout, engineering and operation. The three criteria below must appear in the design before ordering.

01

Useful capacity, not the maximum number of desks

We count workspaces along with aisles, common areas, storage, calls and peak team presence.

Required evidence
Balance of areas according to scenarios and simultaneous presence ratio
What fails if overlooked
High rated capacity reduces acoustics and forces employees to find a place to call or meet.
02

Growth without throwaway solutions

We plan spare power points, compatible modules and a phased rule for adding workstations instead of buying empty desks in advance.

Required evidence
Team growth scenarios and list of compatible modules
What fails if overlooked
Expansion is stopped due to a removed series, lack of electrical power or the inability to rebuild an existing series.
03

Electrical and cable route

We associate sockets, floor hatches, screens, charging and service access with a specific table configuration before releasing an order.

Required evidence
Combined plan of furniture and engineering points
What fails if overlooked
Extensions cross aisles and hatches become under supports or inaccessible after assembly.

[Result]

managed project for 20 employees

The work is based on four control points: initial data, planning solution, final specification, delivery and acceptance. Changes after approval are recorded and do not remain in correspondence.

  1. 01

    Brief and plan

    We collect staff, premises, restrictions, budget guidelines and launch date.

  2. 02

    Planning and selection

    We verify workstation fit, clearances, storage and building services, then compare compatible product ranges.

  3. 03

    Specification

    We record SKUs, dimensions, finishes, quantities, logistics, installation and approved substitutions.

  4. 04

    Delivery and acceptance

    We label each shipment by zone, assemble the furniture and close every item in the acceptance report.

[Catalog]

Relevant furniture categories

All catalog series

Work tables and stations

Compare series, images and published characteristics. Finishes, availability and deadlines are confirmed in the request.

Open catalog

Office chairs

Compare series, images and published characteristics. Finishes, availability and deadlines are confirmed in the request.

Open catalog

Meeting tables

Compare series, images and published characteristics. Finishes, availability and deadlines are confirmed in the request.

Open catalog

Storage systems

Compare series, images and published characteristics. Finishes, availability and deadlines are confirmed in the request.

Open catalog

Upholstered furniture

Compare series, images and published characteristics. Finishes, availability and deadlines are confirmed in the request.

Open catalog

[Q&A]

Questions about the solution “Office configuration for 20 employees”

Direct answers without unconfirmed prices, terms and local promises.

Discuss the problem
What is included in the “Office configuration for 20 employees” solution?

The project includes analysis of initial data, verification of layout, selection of compatible series, line-by-line specification and agreed upon delivery and installation scenario. The exact composition depends on the object.

What should be checked before approving the solution?

The main error of scale is to count only jobs. This underestimates the area, budget and deadlines, and common areas have to be purchased at the last moment. First of all: create several reserve places and do not overload the room with cabinets

How should the completed result be accepted?

Result criterion: managed project for 20 employees We check the layout, completeness, articles, finishes, assembly and comments on the act.

How is the cost calculated?

The cost is calculated after confirmation of layout, quantity, configurations, materials, address, logistics and installation. Unconfirmed prices are deliberately not published on the page.

Is it possible to implement the project in another city in Kazakhstan?

Yes. Design can be carried out remotely, and the route, packaging, installation and deadline are calculated for a specific city and site.

What information is needed to get started?

You need an up-to-date PDF or DWG, number of employees, list of premises, photographs of the facility, city, desired launch date and budget guideline.

[See also]

Related solutions

All pages of the section

Office equipment for 10 employees

Layout, furniture, budget structure and supply of an office for 10 employees.

More details

Office equipment for 50 employees

Layout, furniture, budget structure and supply of an office for 50 employees.

More details

Office equipment for 100 employees

Layout, furniture, budget structure and supply of an office for 100 employees.

More details

[Next step]

Get the project and line-by-line specification

Send us your plan and staffing program. We'll tell you what's missing for the calculation and suggest the next working step.

Add project details

Do you have a plan? Send the file to the manager via WhatsApp after the application - this way we will prepare the project faster.

Send a plan

WhatsApp