[Decision guide]
What this article will help you decide
companies that complete an office or branch network in Kazakhstan
connect the project, packaging, intercity logistics and installation in one schedule
do not calculate the deadline only by the availability of goods: packaging, route, reloading, access to the site and local installation change the launch date
What is the difference between a store, a showroom and a project kit?
The online catalog is convenient for comparing sizes, features and prices. A showroom is needed where the decision depends on sensations: the fit of the chair, the height of the armrests, the texture of the tabletop, the rigidity of the sofa and the operation of the mechanisms. The design package combines these positions into space and answers the question of whether they will fit in a real office.
If the procurement includes workstations, meeting rooms, offices and storage, selecting items separately creates the risk of mismatching shades, timing and sizes. A single specification links the furniture to the floor plan, electrical, routes and opening date.
- catalog - for initial selection;
- showroom - to check fit and materials;
- 2D/3D project - to check the layout;
- specification - for price, quantity and timing;
- installation plan - for an organized installation.
What should you check in the showroom?
Sit in the chair for at least a few minutes and adjust the height, depth, lumbar support and armrests. Check whether you can move closer to the selected table and whether there is room for your legs. For upholstered furniture, evaluate the seating height, the fabric's resistance to intensive use, and the ability to replace individual elements.
View materials in different lighting. A small color swatch may look different on a larger surface. Please ask for the exact decor name, fabric, color code and acceptable differences between batches.
When to choose furniture from a warehouse in Almaty?
Warehouse items are suitable if the office needs to be launched quickly and standard sizes and colors are acceptable. But the word “in stock” should refer to the required quantity, not just one demo sample. Request the reserve, the date the order was completed, and a list of items that will have to be replaced.
Custom colors, custom geometries or large series require production lead times. A rational option is to divide the launch into critical workstations and a second stage, without compromising the quality of the chairs and main tables.
- confirmed balance for each item;
- a single batch of materials for visible areas;
- reserve for the approval period;
- delivery, assembly and correction time.
What does a PoMo customer receive in Almaty?
In Almaty you can visit Showroom PoMo Union Office, compare solutions and discuss the project with a specialist. The company has been operating since 2004, performing planning, furniture selection, supply, installation and service.
To start the project, send the plan and number of employees. The team will prepare zoning logic and specifications, and confirm availability and current prices as of the offer date.
Sources and useful materials
- Showroom PoMo Union Office in Almaty
- Office furniture catalog PoMo Union Office
- Implemented projects PoMo Union Office
Frequently asked questions
Where to see PoMo office furniture in Almaty?
In the showroom at the address: Almaty, microdistrict. Samal-1, building 4, Dostyk Avenue. Before your visit, it is better to agree on the models you want to check.
Is office furniture available?
The catalog presents items with prices and balances, but the actual quantity is confirmed before ordering.
Can I get an office plan before purchasing?
Yes, PoMo performs 2D and 3D planning after receiving sufficient input data.
What to choose for urgently opening an office?
Check warehouse workstations and chairs first, then agree on a second line for non-critical or custom items.
A low-commitment first step
Estimate a project and delivery to your city
Send the city and address of the facility, plan, volume, date of readiness of the premises, restrictions on unloading and installation. During working hours, the team will clarify the missing data and prepare a preliminary composition of the delivery and calculation of the logistics scenario.
- 01
You share the project details city and address of the facility, plan, volume, date of readiness of the premises, restrictions on unloading and installation.
- 02
We review the brief We clarify the restrictions, availability and scope of work.
- 03
You receive a clear next step preliminary composition of the supply and calculation of the logistics scenario.

